F22 Raptor


It is primarily an air superiority fighter, but has multiple capabilities that include ground attack, electronic warfare, and signals intelligence roles.
The United States Air Force considers the F-22 a critical component of the US strike force, and claims that the F-22 cannot be matched by any known or projected fighter aircraft. Air Chief Marshal Angus Houston, Chief of the Australian Defence Force, said in 2004 that the "F-22 will be the most outstanding fighter plane ever built."
Faced with a protracted and costly development period, the aircraft was variously designated F-22 and F/A-22 during the three years before formally entering US Air Force service in December 2005, as the F-22A. Lockheed Martin Aeronautics is the prime contractor and is responsible for the majority of the airframe, weapon systems and final assembly of the F-22.

Program partner Boeing Integrated Defense Systems provides the wings, aft fuselage, avionics integration, and all of the pilot and maintenance training systems.


Development
In 1981 the United States Air Force (USAF) developed a requirement for a new air superiority fighter, the Advanced Tactical Fighter (ATF), to replace the capability of the F-15 Eagle, primarily the F-15A, B, C and D variants. ATF was a demonstration and validation program undertaken by the USAF to develop a next-generation air superiority fighter to counter emerging worldwide threats, including development and proliferation of Soviet-era Su-27 "Flanker"-class fighter aircraft.

It was envisaged that the ATF would incorporate emerging technologies including advanced alloys and composite materials, advanced fly-by-wire flight control systems, higher power propulsion systems, and low-observable/stealth technology.
A request for proposal (RFP) was issued in July 1986, and two contractor teams, Lockheed/Boeing/General Dynamics and Northrop/McDonnell Douglas were selected in October 1986 to undertake a 50-month demonstration/validation phase, culminating in the flight test of two prototypes, the YF-22 and the YF-23.
On 23 April 1991 the USAF ended the design and test flight competition by announcing Lockheed's YF-22 as the winner. It was anticipated at the time that 650 aircraft would be ordered.
Into production


The first operational F-22 Raptor is painted at the Lockheed Martin assembly plant at Marietta, Georgia

The first production F-22 was delivered to Nellis Air Force Base, Nevada, on 14 January 2003 and "Dedicated Initial Operational Test and Evaluation" commenced on 27 October 2003.

By 2004, 51 Raptors had been delivered.
The first crash of a production F-22 occurred during takeoff at Nellis Air Force Base on 20 December 2004, in which the pilot ejected safely prior to impact. The crash investigation revealed that a brief interruption in power during an engine shutdown prior to flight caused a malfunction in the flight-control system; consequently, the aircraft design was corrected to avoid the problem.
In August 2007, the United States Air Force signed a $5 billion, multi-year contract with Lockheed Martin that will extend production to 2011, and as of 2008, F-22 Raptors are being procured at the rate of 20 per year.
In a ceremony on 29 August 2007, Lockheed Martin reached its "100th F-22 Raptor" milestone, delivering AF Serial No. 05-4100.
Procurement


Two F-22s during flight testing, the upper one being the first EMD F-22, "Raptor 01".

The United States Air Force originally planned to order 750 ATFs, with production beginning in 1994; however, the 1990 Major Aircraft Review altered the plan to 648 aircraft beginning in 1996.

The goal changed again in 1994, when it became 442 aircraft entering service in 2003 or 2004, but a 1997 Department of Defense report put the purchase at 339. In 2003, the Air Force said that the existing congressional cost cap limited the purchase to 277.

By 2006, the Pentagon said it will buy 183 aircraft, which would save $15 billion but raise the cost of each aircraft, and this plan has been de facto approved by Congress in the form of a multi-year procurement plan, which still holds open the possibility for new orders past that point. The total cost of the program by 2006 was $62 billion.
In April 2006, the cost of the F-22 was assessed by the Government Accountability Office to be $361 million per aircraft.

This cost reflects the F-22 total program cost, divided by the number of fighters the Air Force is programmed to buy; and which has so far invested $28 billion in the Raptor's research, development and testing. That money, referred to as a "sunk cost", is already spent and is separate from money used for future decision-making, including procuring a copy of the jet.

The Unit Procurement Cost was estimated at $177.6 million in 2006 based on a production run of 181 airframes. This unit cost will decrease if total production is higher. This cost includes $3.233 billion already spent on research and development by 2006.
By the time all 183 fighters have been purchased, $34 billion will have been spent on actual procurement, resulting in a total program cost of $62 billion or about $339 million per aircraft.
F22 Raptor
F-22 RAPTOR DEBUT Presented By Leo Mann
F-22 Raptor Airshow Demo At Langley Air Force Base
F-22 Raptor
F-22 Raptor At Farnborough Airshow 2008
F-22 Raptor RC
AVIATION: F22 Raptor
F-22 Supermanouverability
Aviation Nation 2008 - F-22 Raptor Demo
Sapac F22 Raptor
''

Mining - Iron Ore, Nickel Ore, Steam Coal, Thermal CoalMerger And Acquisition Risk Arbitrage Real Time DataSocial Investing RevolutionInternational Steel Trading Company - Iron Ore, Millscale, Steel Scrap, HMS, Stainless SteelLatest Breaking Finance, Wall Street, Stock Market NewsCheap Sim Free Mobile PhonesWorld's Easiest, Best, Free Stock Portfolio Performance Analysis, Management and TrackerFree College Library - Free Information Guide To All The Questions In This World.